Pilot Operated, Balanced Piston Sequence
Main Stage with Integral T-8A Control Cavity

Sun Hyd _Valve _Sequence _Pilot Operated _Balanced Piston _Main Stage With Int T-8A Cont Cavity Model Capacity Cavity
RSDC8 15 gpm T-11A
RSFC8 30 gpm T-2A
RSHC8 60 gpm T-17A
RSJC8 120 gpm T-19A
 
 
 

p>Available in: Arkansas, Louisiana, Oklahoma and Texas